NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
Cads-Group offers free demo for
(
). You can check out the interface, question quality and usability of our practice exams before you decide to buy it. We are the only one site can offer demo for almost all products.
By keeping minimizing weak points and maiming strong points, our P_BTPA_2408 exam materials are nearly perfect for you to choose, While, if your time is enough for well preparation, you can study and analyze the answers with the help of the P_BTPA_2408 exam explanations, Our P_BTPA_2408 Reliable Test Tutorial - SAP Certified Professional - Solution Architect - SAP BTP guide torrent can simulate the exam and boosts the timing function, The latest P_BTPA_2408 exam is new available at Cads-Group, you will get the latest P_BTPA_2408 SAP Certified Professional exam dumps to best prepare for your test, Cads-Group ensures you pass your P_BTPA_2408 SAP Certified Professional –SAP Certified Professional - Solution Architect - SAP BTP Exam easily.
And then once schedules and costs are under control, you Reliable P_BTPA_2408 Test Experience reach a plateau where you need to make major changes for further progress, Follow along with Ibarionex and you will: Learn to confront the fear of approaching strangers Reliable P_BTPA_2408 Test Experience for photos, realizing that most potential subjects will be flattered they are worthy of your photographs.
Is calculator allowed, Using Add All can be very dangerous, because https://lead2pass.testvalid.com/P_BTPA_2408-valid-exam-test.html your audio files will be in various folders on your hard drive rather than inside the Audio Files folder where they should be.
Auditing Your Security Infrastructure, The first deals theoretically https://pass4sure.actualpdf.com/P_BTPA_2408-real-questions.html with how the protocol works, But early stage companies with strong value propositions and proven management teams can get funding.
Create location-based reminders that trigger at destinations Valid D-PSC-MN-23 Exam Dumps like the drugstore, The most common design for remote users is to use multilayer switches or routers.
Setting Up and Configuring Remote and Linked Flexible C_THR85_2311 Testing Engine Servers, I didn't have any lab work, of course, but by the end of the summer when I got out to Cal Tech and I took the chemistry Reliable P_BTPA_2408 Test Experience and math exams I got a scholarship based on the results, so I must have done all right.
To remove the Edit bar from your workspace, choose Window > Toolbars D-DPS-A-01 Reliable Test Tutorial > Edit Bar, Unlike the which matches any single character, sets enable you to match specific characters and character ranges.
Sander van Vugt is an independent Linux specialist, living in the Netherlands, with customers all over the world, As online products, our P_BTPA_2408 : SAP Certified Professional - Solution Architect - SAP BTP useful training can be obtained immediately after you placing your order.
The metadata can be used to configure an identical environment or integrate with a source control system, By keeping minimizing weak points and maiming strong points, our P_BTPA_2408 exam materials are nearly perfect for you to choose.
While, if your time is enough for well preparation, you can study and analyze the answers with the help of the P_BTPA_2408 exam explanations, Our SAP Certified Professional - Solution Architect - SAP BTP guide torrent can simulate the exam and boosts the timing function.
The latest P_BTPA_2408 exam is new available at Cads-Group, you will get the latest P_BTPA_2408 SAP Certified Professional exam dumps to best prepare for your test, Cads-Group ensures you pass your P_BTPA_2408 SAP Certified Professional –SAP Certified Professional - Solution Architect - SAP BTP Exam easily.
Firstly, if you have any questions about purchasing process of the P_BTPA_2408 training materials: SAP Certified Professional - Solution Architect - SAP BTP, and you could contact our online support staffs, It is really necessary for Reliable P_BTPA_2408 Test Experience you to keep learning with even patience before you're good enough to live out your ambition.
The Software version of P_BTPA_2408 sure-pass learning materials is the simulation of real test and gives you formal atmosphere of real environment, which is without the restriction of installation and apply to various digital devices.
The P_BTPA_2408 training cram has the comprehensive contents which cover almost main points in the actual test, And if you still don't believe what we are saying, you can log on our platform right now and get a trial version of P_BTPA_2408 study engine for free to experience the magic of it.
You don't want to be replaced, right, Three versions for your choice: Reliable P_BTPA_2408 Test Experience PDF file, PC test engine, APP test engine, We offer customer support services that offer help whenever you'll be need one.
If you want to find valid P_BTPA_2408 test torrent, our products are helpful for you, In addition, we have a professional team to collect the first-hand information for P_BTPA_2408 exam braindumps, and if you choose us, we can ensure that you can obtain the latest information for the exam.
Efficient study plan, For most IT workers, working in the P_BTPA_2408 will be amazing but getting P_BTPA_2408 certification is a long and tough task.
NEW QUESTION: 1
Which as-path access-list regular expression should be applied on R2 as a neighbor filter list to only allow updates with an origin of AS 65503?
Refer to the exhibit.
A. 0
B. _65503.?$
C.
It is well known that 65503$
Answer: C
Explanation:
http://www.cisco.com/c/en/us/td/docs/ios/12_2/termserv/configuration/guide/ftersv_c/tcfaap re.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
Quality and Value for the 65503$
Answer: C
Explanation:
http://www.cisco.com/c/en/us/td/docs/ios/12_2/termserv/configuration/guide/ftersv_c/tcfaap re.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
Cads-Group Practice Exams for P_BTPA_2408 65503$
Answer: C
Explanation:
http://www.cisco.com/c/en/us/td/docs/ios/12_2/termserv/configuration/guide/ftersv_c/tcfaap re.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
If you prepare for the exam using our Cads-Group testing engine, we guarantee your success in the first attempt. If you do not pass the
(ProCurve Secure WAN) on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
Our Exam 65503$
Answer: C
Explanation:
http://www.cisco.com/c/en/us/td/docs/ios/12_2/termserv/configuration/guide/ftersv_c/tcfaap re.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
Our P_BTPA_2408 65503$
Answer: C
Explanation:
http://www.cisco.com/c/en/us/td/docs/ios/12_2/termserv/configuration/guide/ftersv_c/tcfaap re.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
http://www.Cads-Group.com The safer.easier way to get
Feedbacks
Aalk - 2014-05-05 16:45:18
Plato - 2014-05-05 16:45:51
I successfully passed the 65503$
Answer: C
Explanation:
http://www.cisco.com/c/en/us/td/docs/ios/12_2/termserv/configuration/guide/ftersv_c/tcfaap re.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
exam, now I intend to apply for 65503$管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
Answer: C
Explanation:
http://www.cisco.com/c/en/us/td/docs/ios/12_2/termserv/configuration/guide/ftersv_c/tcfaap re.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
, you can be relatively cheaper?Or can you give me some information about 65503$管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
Answer: C
Explanation:
http://www.cisco.com/c/en/us/td/docs/ios/12_2/termserv/configuration/guide/ftersv_c/tcfaap re.html
NEW QUESTION: 2
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of
A. Making Governance Decisions
B. Creating an up-to-date list of qualified portfolio component
C. Balancing the portfolio for performance and value delivery
D. Allocating resources to develop component proposals or execute portfolio components
Answer: B
Explanation:
Explanation
The purpose of the Define Portfolio process is to create an up-to-date list of qualified portfolio components by identifying, categorizing, scoring, and ranking portfolio components
NEW QUESTION: 3
exam?管理者は、セキュリティ上のリスクがあるため、従来の臨床ソフトウェア製品を交換したいと考えています。レガシー製品の月収は1万ドルです。この新しいソフトウェア製品の初年度費用は、初期費用が18万ドル、年間保守費用が2,000ドルです。ただし、月に15,000ドルの収益があり、より安全です。この新しいパッケージの投資収益が出るまでに何年かかりますか?
A. 0
B. 1
C. 2
D. 3
Answer: D
Explanation:
Return on investment = Net profit / Investment
where:
Profit for the first year is $60 000, second year = $ 120 000 ; third year = $ 180 000 ; and fourth year = $ 240 000
investment in first year = $ 180 000, by year 2 = $ 182 000; by year 3 = $ 184 000 ; and by year 4 = $ 186 000
Thus you will only get a return on the investment in 4 years' time.
References:
http://www.financeformulas.net/Return_on_Investment.html
Eleanore - 2014-09-28 16:36:48